## This week

Q&A

[Q&A](https://economistzone.com/qa/)

# How Workplace Leaders Protect Teams From Burnout

EZ![](https://featured-com-images.s3.us-west-1.amazonaws.com/featured-sites/economistzone.com/sanity/4dpk7z9s/66f5553f28b2ab6f8d2e7dbc146205c1bf5029bb-260x260.svg) [Economist Zone](https://economistzone.com/author/economistzone-com/)November 25, 202622 min read

§ How this was made

The perspectives in this article were written by the named contributors and submitted through Connectively. Connectively's automated system selected them and used AI to write the headline, introduction, section headings, summary sections, and illustration, and to make minor edits for clarity. Articles are assembled and published automatically. Report errors to corrections@connectively.us. [How we make our content](https://economistzone.com/editorial-policy/)

![](https://economistzone.com/hero/how-workplace-leaders-protect-teams-from-burnout.svg)

Illustration generated with AI

Burnout can build quietly when workloads, overtime, and constant requests go unchecked. Workplace experts share practical ways leaders can protect team capacity before pressure turns into exhaustion. From setting clear limits to scheduling recovery time, these steps help teams sustain strong performance.

## What the experts said

25 contributors

1.  Forecast Workloads Before Commitments

    Vaibhav Kakkar

2.  Cut Low-Value Tasks Each Monday

    Will Mitchell

3.  Redistribute Tasks Through Load Checks

    Roman Surikov

4.  Filter After-Hours Calls With AI

    Jens Hagel

5.  Set Renovation Caps Before Peaks

    Nick Kuang

6.  Reserve Twenty Percent for Decompression

    Bharat Sharma

7.  Limit Overtime During Dive Season

    Natalie Shuman

8.  Flag Repeated Late-Night Hours

    Dhwani Shah

9.  Defer Extras Until December

    Neil Webster

10.  Encourage Candid Capacity Conversations

     Marc Gottwald

11.  Enforce Daily Request Cutoffs

     Mark Bietz

12.  Offer Flexible Work-Time Options

     Lina Haj Hussien

13.  Cap Daily Cleaning Assignments

     Carolyn Vasquez

14.  Rotate a Workload Advocate

     Brian Hansen

15.  Prioritize Critical Accessibility Issues

     David LoPresti

16.  Publish a Peak Pause List

     Dane Maxwell

17.  Schedule Recovery Breaks Every Ninety Minutes

     Wilson Meloncelli

18.  Assign Clear Decisions and Deadlines

     Jennifer Hogshead, BA

19.  Define a Clear Surge Endpoint

     Sarah Gray

20.  Distribute Callouts Across the Roster

     Joshua Harrison

21.  Mark the Push's End With Appreciation

     Vincent Nero CRP

22.  Outsource Variable Fulfillment Volume

     MING-YUAN XIE

23.  Match Response Promises to Team Limits

     Emma Rusby

24.  Include Labor Hours in Production Plans

     Prabhas Kumar

25.  Automate One Repetitive Chore Weekly

     Daniel Goh

VK![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/e44b67ad-7142-41be-9182-a06e35666a03.webp)

[Vaibhav Kakkar](https://www.linkedin.com/in/%F0%9F%8F%86-vaibhav-kakkar-494b0b3) — Founder and Group CEO, [Digital Web Solutions](https://www.digitalwebsolutions.com/)

### Forecast Workloads Before Commitments

During a demanding period, we introduced a weekly workload forecast before finalizing commitments. Each person shared their main priorities, possible obstacles, and tasks most likely to face interruptions. This helped us understand the team's actual capacity before deadlines became difficult to manage. It also made potential problems easier to address early.

The goal was not to create another status update. Instead, we gave everyone room to question assumptions before pressure affected working relationships. When deadlines exceeded our capacity, we adjusted the scope, order, or ownership early. This revealed repeated bottlenecks that had been mistaken for individual performance issues and helped us maintain a healthier pace through realistic planning.

WM![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/d56dbb27-1ade-42ee-b913-bcbda33c23cd.webp)

[Will Mitchell](https://linkedin.com/in/willmitchell) — Founder, [StartupBros](https://startupbros.com/)

### Cut Low-Value Tasks Each Monday

When a long push starts wearing on my team, I bring in the hot-seat format from the business masterminds I run. In those sessions an entrepreneur lays everything on their plate out in front of the group, and the group presses them to cut something. I adapted that into a short load check for my own people during demanding stretches.

Every Monday, each person lists what they're carrying, marks which items actually move our goals for the quarter, and names one thing they'll drop, defer, or hand to someone else. I go first, and I put my own cuts on the table. If I'm answering messages at midnight and asking everyone else to pace themselves, nobody takes the meeting seriously.

What comes out of those Mondays is a shorter list with a clear owner on every item. We renegotiate deadlines early in the week, while there's still room to move them, so nobody is quietly absorbing a slipped deliverable with late nights on Thursday. The low-value work gets cut out loud, in front of everyone.

I watch the drop column closely. When someone goes a few weeks without cutting anything, I don't read that as stamina. I sit down with them one-on-one, and we pull something off their plate together before the week starts.

RS![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/732f12d1-adb0-47c4-a0fb-1f2666e046c2.webp)

[Roman Surikov](https://www.linkedin.com/in/roman-surikov) — Founder & CEO, [Ronas IT | Software Development Company](https://ronasit.com/)

### Redistribute Tasks Through Load Checks

When someone shows signs of burnout, I review what they're carrying and reduce their workload. Continued pressure on the same commitments threatens the next delivery as well as the person's health. A conversation matters because it lets us identify the load they can manage; planning has to change when current commitments exceed capacity.

We spoke with an employee who was showing those signs. I went through their current commitments with them, took some tasks off their plate, and followed up afterward. They told us the workload had become manageable and they felt better. Following up is part of the practice, because the person's experience after the work is removed tells us whether the change helped. It also gives them another chance to say whether the load remains unmanageable.

During planning, we also check commitments against available time. Our Planning list in ClickUp and a filtered workload chart in Metabase help us see when too many tasks or projects sit with one person. We revise priorities and redistribute work across the team when that happens. The direct conversation adds the person's experience to the planning picture. Used together, those checks give us a chance to adjust the load before high pressure becomes routine.

JH![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/310aa3b0-97df-4ccd-a340-e71302507e14.webp)

[Jens Hagel](https://www.linkedin.com/in/jens-hagel-77671549) — Founder & Owner, [kjello](https://www.kjello.de/)

### Filter After-Hours Calls With AI

I founded an IT firm that now has 32 people, and in support the pressure builds up around out-of-hours calls. What helped us is an AI phone assistant for exactly those hours. On weekdays from 8 to 6 a person always answers, but at night and at weekends the assistant takes the call, books a slot in the technicians' calendar and only alerts the on-call engineer for a real emergency. I'd rather filter the calls than ask people to be tougher. Jens Hagel, Founder & Owner, kjello (Hamburg, Germany)

NK![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/e7bef162-b390-4bbf-bb87-e4068d3d3d99.webp)

[Nick Kuang](https://www.linkedin.com/in/nickkuang) — Co-founder, [Home Sweet Home Offers](https://homesweethomeoffers.com/)

### Set Renovation Caps Before Peaks

Burnout usually starts with saying yes to one more project than your capacity can handle, so the fix is deciding how much you'll take on before the busy stretch hits. Our company is two co-founders plus the contractors we hire for each house, and in a strong market it's tempting to put every good deal under contract. What protects our pace is a hard cap on how many renovations we run at the same time, which we set from how many sites we can personally walk each week. When we're at the cap, a new deal has to clear a higher bar or we pass. We also give contractors realistic schedules instead of compressed ones, because rushed crews make mistakes that cost more to fix than a few extra days. My takeaway is to treat capacity as a number you decide on calm days, not something you rediscover when everyone is exhausted.

BS![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/728d740d-3731-481f-a745-ddd49cd07186.webp)

[Bharat Sharma](https://www.linkedin.com/in/bharat-sharma-0794ba176) — Delivery Manager, Enterprise CX Solutions, [eSignly](https://www.esignly.com/)

### Reserve Twenty Percent for Decompression

Achieving results during continual periods of high demand requires changing the way we perceive capacity. We must stop seeing capacity simply as something to fill time and instead understand that it is an asset that will wear away over time. When I managed various projects in enterprise digital transformation, I noticed that burnout becomes natural among employees due to the failure of leaders to differentiate between a temporary rush and permanent changes in operational tempo. To prevent this, I always use a detailed capacity planning process that includes the hidden costs of complicated delivery such as compliance checks and the need to coordinate between departments, not only the sum of engineering and software development hours. My experience in making teams deliver projects internationally for 20 years has taught me that performance cannot be treated as an elastic quantity allowing its infinite use. The biggest game-changer for my teams has been the implementation of a strict capacity ceiling that I call the 80 percent threshold. While working on high-profile projects requiring prompt document processing and strict compliance with security demands, there is always a temptation to use all professional hours. Instead, we deliberately reserve 20 percent of the working week for the team and do not let them work on any clients. This time will not be used for rest but for decompression, documentation, and peer reviews. This way we avoid accumulating the technical and psychological debt that would likely lead to failures in quality. When the team knows that they have some space to work on the problem without the burden of timing, they deliver better results. I have learned that constant pressure of reaching full capacity affects team ability to innovate and see risks.

NS![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/ad14dd03-71c4-47e4-84d6-8345dc1a00d1.webp)

[Natalie Shuman](https://www.linkedin.com/in/neshuman) — Owner, [Sun Divers Roatan](https://sundiversroatan.com/)

### Limit Overtime During Dive Season

High season on Roatan is demanding, and we know that going into it every year. We have long days, full boats, and plenty of guests wanting to dive, so we've made a conscious decision not to let burnout become part of the job.

One of the biggest things we do is put limits on overtime. Our team has the option to work extra days and earn more, but we don't want anyone feeling obligated to do so. There are times when that means turning away business, and we're okay with that. In diving, having a rested, happy crew isn't just important for morale; it's essential for safety.

We also bring seasonal staff on early so they have time to settle in before the busy season, maintain flexible scheduling, and regularly check in with the team through what we call "vibe checks" to understand how people are feeling and what they need.

Ultimately, I think preventing burnout has to be intentional. You can't wait until the busy season is over to start looking after your people. We want our team to enjoy coming to work, and I think that comes through in the experience our guests have, too. They often comment on how genuinely happy our team seems, and that's something we're really proud of.

DS![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/bae6140a-5a38-452c-8de5-8e5a1df5ff4d.webp)

[Dhwani Shah](https://www.linkedin.com/in/dhwanishah15) — Assistant Manager Human Resources, [Qubit Capital](https://qubit.capital/)

### Flag Repeated Late-Night Hours

Every Friday I check who on our team was online after 9 at night more than twice that week. It is a rough signal for a remote team, most of it in India. Anyone on that list gets a call from me, not an email.

The list grows before the spring conference season in Europe. That is when many founders we match with investors want meetings in the same few weeks. The work holds up long enough for you to ignore the late nights. We tried giving each person on the busiest team 1 weekday with no calls. We spread those days out so the founder work kept moving. I cannot tell yet if it cut the hours or just pushed them into Saturday. Over the 6-week trial, the Friday list went from 9 names to 3.

NW![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/ee088f1d-57d7-433e-b47d-627525895893.webp)

[Neil Webster](https://linkedin.com/in/neilwebster1) — CEO, [Mills Shelving](https://www.millsshelving.com.au/)

### Defer Extras Until December

Before asking a busy team to absorb more work, check whether anyone has time to own it. We wanted to gather project photos and customer reviews at Mills Shelving, but our busy season left nobody with enough capacity. I chose to return to that work in December as part of our planning. That protected the customer commitments already on the team's desk and gave the extra work a realistic place to start. A useful workload conversation ends with an actual decision about what can wait. Otherwise, an unchanged task list quietly becomes an expectation that people will find more hours.

MG![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/d8c5ac54-b86e-4ca4-92f6-1828f69cbe13.webp)

[Marc Gottwald](https://www.linkedin.com/in/marc-gottwald-419819155) — CEO & Co-Founder, [Luxury Tours Switzerland](https://luxurytoursswitzerland.com/)

### Encourage Candid Capacity Conversations

In travel, sustained workloads are part of the business. During high season, from April to October, our team could work every single day and still find something that needs attention. So the question for us is not how to avoid demanding periods. It is how to move through them without making exhaustion normal.

The practice that has helped most is a simple internal agreement. Every team member is encouraged to say openly when something becomes too much, and when they do, we find a solution together. Nobody is expected to absorb pressure silently to prove commitment. That honesty only works if leaders show it first. When it becomes too much for me, I take a half day off, delegate the important tasks to my team, and inform specific partners that I am not available. A real half day away is more restorative than a full day of half attention.

The second practice is structural. We work with seasonal contracts for part of our team, which allows us to add capacity when the high season demands it rather than stretching the same people further every year. Clear ownership helps as well. When every step from inquiry to follow-up has a responsible person, work can be shared without anything getting lost, and nobody becomes the single point of failure.

Protecting performance also means protecting the team's positivity. Positivity is one of our core values, and our clients feel it immediately. A guide who is exhausted cannot create the moment a family remembers for the rest of their life. A team that is cared for can.

My advice to other leaders is to make it safe to speak about capacity before it turns into burnout. If people have to hide that they are struggling, you will only find out when performance has already dropped.

A healthy pace is not the opposite of high performance. In a service business, it is the condition for it.

MB![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/3584dfe1-851d-4843-8830-bc23844f5d73.webp)

[Mark Bietz](https://linkedin.com/in/markbietz) — CMO, [Halloween Costumes](https://www.halloweencostumes.com/)

### Enforce Daily Request Cutoffs

We look for the moment when extra effort stops being exceptional and starts becoming invisible. That is when leaders need to step in. During demanding periods, we set a clear handoff rule. Any work arriving after the daily cutoff was moved to the next planning window unless it met the escalation standard.

The rule did not remove urgency but made it accountable. Anyone requesting an exception had to explain the impact of waiting and identify which existing priority should move. This improved the quality of requests and reduced unnecessary fire drills. It also helped employees protect their evenings without appearing uncommitted, allowing teams to stay focused and trust that late requests were not personal emergencies.

LH![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/855e574f-0c7e-46ce-8b5c-2b3485fa6ea8.webp)

[Lina Haj Hussien](https://www.linkedin.com/in/linahajhussein) — Founder and CHO, Employee Engagement & Experience Manager, [Inspire](https://www.weinspire.ae/)

### Offer Flexible Work-Time Options

In the face of heavy workloads, I try to avoid taking work away as the only option. I ask check in questions first to show I care, while avoiding answering the question "what do you need?" for them. I try to provide flexibility with constraints. One way to do this is provide options around when work is done. Having a sense of control over when work is done can help relieve stress and provide a better sense of control over work.

CV![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/f286d4a6-ed1b-49d9-bc4a-202c07771798.webp)

[Carolyn Vasquez](https://www.linkedin.com/in/carolyn-vasquez-42a51a44) — Founder, [Ready Rental Cleaning](https://readyrentalcleaning.com/)

### Cap Daily Cleaning Assignments

The practice I rely on is a hard daily cap on jobs per cleaning team, set before the busy season starts. In vacation rental turnovers, demand arrives in waves. Holiday weekends, big events, and checkout-heavy Sundays all stack up at once, and every host wants the same 11 a.m. to 4 p.m. window.

The temptation is to say yes to one more home. Each yes feels small, but the cleaners are the ones who pay for it. The last home of a long day is where the missed details show up, because tired people skip the corners nobody sees until a guest does.

So the cap is fixed ahead of time, and when it's full I say so plainly and offer the next open day. Hosts handle a no with a date attached far better than they handle a sloppy turnover. Once the cap exists, nobody has to negotiate it at 4 p.m. on a Saturday while a host is texting.

The second half is recovery. After a heavy stretch, the following day gets a lighter schedule with the shortest drives I can build. Sustained load only stays survivable when the pace drops back down somewhere. Performance in this work is physical. Bending, scrubbing, and hauling linens for six hours is a body problem before it's a motivation problem, and no pep talk fixes a body that hasn't rested.

BH![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/040e806e-9f00-4d27-9f67-2971f8560d17.webp)

[Brian Hansen](https://www.linkedin.com/in/brianghansen) — President, [Rocket Pilots](https://rocketpilots.com/)

### Rotate a Workload Advocate

The clearest warning sign of burnout is not always lower output. I have seen highly capable people maintain results for months while becoming less creative, less patient, and less willing to raise concerns. By the time performance declines, the underlying strain may already be significant.

A practice that helped was assigning a rotating workload advocate in planning meetings. That person's role was to ask what would be delayed, what assumptions were risky, and whether deadlines required additional support. The responsibility rotated so it never became one individual's burden to challenge the group. This created a constructive check on optimism and prevented workload concerns from being dismissed as negativity. Better decisions followed because capacity was discussed as openly as goals, timelines, and expected outcomes.

DL![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/18d4fb49-b8f6-4881-880f-734fe703670d.webp)

[David LoPresti](https://www.linkedin.com/in/david-lopresti-1a4513b4) — Co-Founder & CEO, [CompliCorp](https://complicorp.com/)

### Prioritize Critical Accessibility Issues

When the workload stays heavy for weeks, I protect performance by narrowing what has to be perfect, not by asking people to stay later. On a manual accessibility audit, the core user flows and the WCAG failures that block real users get full attention. Lower-impact items get logged with a date instead of being chased at midnight.

The practice that helped most was finding the sweet spot between what the client needs and what my team can realistically take on given its current workload. Our audits take about two weeks on average, and holding to realistic dates keeps the team out of permanent crunch mode.

Burnout gets normalized when every deadline is treated as an emergency. Being clear with clients about timelines early keeps a demanding month from becoming the normal pace.

DM![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/96d53074-fe56-403f-a453-cf0df8431c95.webp)

[Dane Maxwell](https://www.linkedin.com/in/dane-maxwell-b7105b5b) — Founder, [Paperless Pipeline](https://www.paperlesspipeline.com/)

### Publish a Peak Pause List

I protect performance by deciding in advance what the team will stop doing during a peak, instead of asking everyone to do everything faster. Real estate has a predictable crunch. Paperless Pipeline customers closed about 30,000 transactions in June 2026 ([https://www.paperlesspipeline.com/](https://www.paperlesspipeline.com/)), and when brokerages are that busy, our support queue and onboarding calls rise with them. The temptation is to keep every project moving and lean on goodwill. That holds for a couple of weeks, and then the quality of answers slips and people start quietly working evenings. The practice that helped most is a short written pause list agreed before the busy months arrive. It names the internal projects, nice-to-have improvements and meetings that get parked until the peak passes, and the whole company can see it, so nobody feels they're slacking by leaving those things alone. Support and onboarding get the protected time, because that's where a brokerage under deadline pressure feels us most. I also watch one simple signal. When the same person is answering tickets late in the evening more than twice in a week, I treat it as a staffing problem to fix that week. The pause list has a cost. Some roadmap work slips by a month, and customers waiting on it notice. I'd still make that trade every year, because a tired team makes mistakes in transaction files, and those mistakes cost brokerages far more than a delayed feature.

WM![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/47c36b64-30d6-44cd-92cc-e0c81fa3ff1f.webp)

[Wilson Meloncelli](https://www.linkedin.com/in/wilsonmeloncelli) — Human Performance Consultant, [Mavericks Consulting](https://wilsonmeloncelli.com/)

### Schedule Recovery Breaks Every Ninety Minutes

Protect the recovery time first, because a team under sustained load usually breaks down in the hours it never recovers. The body runs in roughly 90-minute waves of focus followed by a dip. When a demanding stretch turns every dip into more pushing, people keep showing up while their judgment quietly thins. From the inside it feels like rereading the same email three times, or snapping at a colleague over something small.

The practice I use with leadership teams during heavy periods is a deliberate break after each 90-minute block of focused work: ten minutes away from screens, written into the calendar like any client meeting. The leader takes it first, and visibly. That matters because a team picks up the leader's state before it hears the words. If the person at the top is running on fumes, a memo about balance changes very little.

When the leader is seen recovering, the team starts to believe recovery is allowed.

Readers can start this week with one change. Book a break after your longest meeting block and guard it the way you would guard a call with your biggest customer. In the 1,200+ founders and operators I've coached across 14 countries, the teams that hold a sustainable pace through hard quarters tend to be the ones whose recovery was planned before they needed it.

JH![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/f70f74b8-e0f5-46d6-a018-2592720dfa78.webp)

[Jennifer Hogshead, BA](https://www.linkedin.com/in/jennifer-hogshead) — Director of Finance and Human Resources, [New Waters Recovery](https://www.newwatersrecovery.com/)

### Assign Clear Decisions and Deadlines

Follow these tips to minimize friction that could cause delays and undermine the success of your project while reducing unnecessary demands on employees' time.

Agendas that focus on reviewing, discussing, or considering without a clear purpose or expected outcome can be ineffective and waste time and energy. The decision maker must ultimately provide closure for the decision and commit the organization to execute it. Indeed, every decision should have a responsible party. Taking responsibility for decisions can save time. Make use of clear deadlines for when decisions will be made. Ambiguity can undermine commitment, and timing is one of the most critical factors that must be made clear. However, if hours worked rather than results produced are emphasized, employees may feel pressure to work longer rather than focus on using their time effectively.

Time limits can help keep meetings focused on the necessary topics. For instance, a scheduling meeting should have the schedule as the expected output; and a decision-making meeting should have a clear decision as output. Assign ownership to the decision maker and project implementer. Remember that discussion and agreement without assignment of responsibility and deadlines for completion is little more than a conversation. Following up on the meetings, decisions, and action items generated by the meetings can help achieve more long-term impact.

SG![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/05bf2597-aeeb-42ed-ad6f-79b56fc63d04.webp)

[Sarah Gray](https://linkedin.com/in/sarah-gray-a944aa59) — HR Director, [Cintra](https://cintra.co.uk/)

### Define a Clear Surge Endpoint

Many organisations find that burnout starts when a busy period quietly becomes the normal pace. The practice that can help is putting an end date on the demanding stretch from the start and saying it out loud, so the extra effort is treated as temporary rather than the new standard.

During that stretch, managers can run a short weekly check that asks what each person has stopped doing to make room. Workload rarely shows up in hours alone. It often shows up in cancelled leave, skipped breaks and late messages, and those signals tend to appear before performance dips.

When the period ends, protect the recovery. People are more likely to give extra effort next time when they have seen the organisation give the time back afterwards. A healthier pace usually comes from that trust rather than from any single wellbeing initiative.

JH![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/507a1d2e-8497-4e51-915a-aae52642490e.webp)

[Joshua Harrison](https://www.linkedin.com/in/joshua-harrison-582874419) — Founder, [Underground Towing & Salvage](https://undergroundtowing.com.au/)

### Distribute Callouts Across the Roster

A 24/7 service needs a roster that makes rest possible; it cannot depend on the most dependable person always accepting another callout. At Underground Towing & Salvage, one useful adjustment was temporarily reducing a driver's after-hours work and sharing it across the team. That gave them more predictable time to recover, and we checked in afterwards to see whether the change was helping. I would also review the load on the colleagues covering those jobs, so relief for one person does not simply transfer the strain. The practical test is whether the workload has changed, not whether someone has been told to look after themselves.

VN![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/e7abec53-da6c-4e73-816f-ef0915cead8f.webp)

[Vincent Nero CRP](https://www.linkedin.com/in/vincentnero) — VP General Manager, [Successories](https://www.successories.com/)

### Mark the Push's End With Appreciation

The practice that held up was naming the last day of the push before it started and ordering the thank-you the same week. A heavy stretch becomes the new normal when nothing marks where it ended, and a date on the calendar fixes that.

The gift can be small, and it doesn't have to be engraved. A good mug or tumbler, a desk toy, or a funny desktop item suits a team coming off a long launch, and it goes to everyone who carried the load instead of the 1 or 2 people named in the all-hands. Engraving earns its extra time when the gift is a keepsake. A personalized piece needs about 7 days for proof and production, and an unpersonalized one has no proof cycle at all. Either way, order when the push begins, so the gift lands the week it closes and not 2 weeks later, when it reads as an afterthought.

A gift doesn't replace cutting the work. It only does its job when the end date is real and the team heard it in advance.

MX![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/6c919acf-3b73-43e5-8f0c-39d96e47b730.webp)

[MING-YUAN XIE](https://www.linkedin.com/in/xmy1983) — Serial Entrepreneur & Founder of Meow Universe, [Meow Universe](https://xmy.tw/)

### Outsource Variable Fulfillment Volume

When I ran an e-commerce business, holiday promotions made fulfillment demand swing sharply. I outsourced warehousing while the company was still small. Making employees absorb each peak would have meant costly overtime and a risk of exhaustion and resignations. Hiring for the peak would have left permanent staff idle in quieter months, while finding suitable temporary workers was difficult and mistakes were more likely.

The practice that protected our team was to plan flexible fulfillment capacity outside the core team instead of treating overtime as the default response to a busy campaign. I kept internal people focused on the work that most needed their judgment, while the warehouse partner handled variable volume. Outsourcing still required quality checks, but it gave us a more sustainable way to handle seasonal spikes.

Ming-Yuan Hsieh, Founder, Meow Universe

ER![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/3354ad95-b3aa-45d7-9b08-eb85ff890f8d.webp)

[Emma Rusby](https://www.linkedin.com/in/emma-rusby) — Director, [Zenvy Beauty](https://zenvy-beauty.com/)

### Match Response Promises to Team Limits

I protect the pace of a small team by making the promise to customers match what the team can deliver on a normal day, and then refusing to break it upward during busy weeks. At Zenvy Beauty our support inbox is answered by people who have curly hair themselves, weekdays only, and the FAQ tells customers we aim to respond within 24 to 48 hours ([https://zenvy-beauty.com/pages/faqs](https://zenvy-beauty.com/pages/faqs)). That window is deliberate. It means a Black Friday rush or the pile of wash day questions that builds up over a weekend does not turn into somebody answering emails at ten at night, because nobody promised an instant reply in the first place.

The practice that helped most during our busiest stretch was splitting the inbox by urgency before anyone started typing. Damaged or wrong orders and delivery problems go to the top and get handled the same day. Product questions, which are most of the volume and the part my team enjoys, get answered properly inside the published window rather than rushed with a stock reply. Rushing those is where quality slips first, and a bad recommendation for low porosity hair costs me a customer far more surely than a reply that arrives the next morning.

I also watch my own behaviour, because in a company this size the founder sets the pace by example. If I start sending messages to staff in the evening, they read it as an expectation, so anything I write late stays in drafts until the next working morning.

PK![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/1aec81ea-2d2c-45c4-835d-36b98b91d4bd.webp)

[Prabhas Kumar](https://www.linkedin.com/in/prabhas-kumar-40382b106) — Consultant, [Boston Consulting Group](https://www.bcg.com/)

### Include Labor Hours in Production Plans

The biggest mistake leaders make during demanding times is to assume employees will continue to work hard when the organization's operating model is placing too much stress on them. Even when working hard, the organization can still be delivering good results, but that does not mean the organization's operating model is sustainable.

I was leading the factory during the COVID-19 pandemic and managing approximately 300 employees at a site that produced soap, sanitizer and handwash. We were meeting increased demand and delivering ambitious production plans at high levels of efficiency. However, the operators were working more machines than previously and working more consecutive days. It became apparent that some of the employees were shortening or even skipping their tea and lunch breaks to complete tasks and some were missing meetings with their teams.

We then added available labor hours as a constraint to our production planning, alongside machine capacity. I worked with the supply-chain team to ensure that our production commitments reflected the actual available labor and with HR to escalate the staffing constraints to the relevant operations leaders and to argue for more hiring.

A key learning from this experience is that sustainable performance needs to be planned around the realistic capacity of employees. If employees are constantly having to work through their breaks and other responsibilities to meet targets then it is not a productivity problem, it is a problem of workload exceeding available capacity.

DG![](https://featured-com-images.s3.us-west-1.amazonaws.com/profile-images/8a1ac9dc-6baa-4f61-9dea-377566ceef9d.webp)

[Daniel Goh](https://www.linkedin.com/in/daniel-goh-957142442) — Chief Marketing Officer, [RankAISearch](https://www.rankaisearch.com/)

### Automate One Repetitive Chore Weekly

1\. I am protecting performance by removing work, not by asking people to work harder. Recently the load increased for a short period of time and so I asked the team to list out all of the repetitive tasks that they are doing on an ongoing basis for one week. A lot of the strain that people are feeling at TradingFXVPS is due to a lot of copy-paste admin type work (status updates, manual reporting etc.) as opposed to the actual work that people are hired to do in order to think. Long hours become normalized very quickly when the leader of a team thinks that increasing the load on the team is the way to fix problems rather than finding the root cause of the problem and fixing the process. Some weeks are just going to be busy and there is no tool that can fix a bad deadline.

2\. My most useful practice at TradingFXVPS was fixing one manual task per week. We would build a small Python program or use AI to automate a task that the team member hated doing. Some of the tasks that we automated to do in seconds were copying and pasting information, formatting reports, and sorting routine requests. We would try to fix one thing at a time and see if we actually saved any time. If we didn't save any time then the practice didn't help. In fact, some of the automated tasks that we created actually generated more checking work than saving the team member time. In the end we decided to get rid of them. The automated tasks that worked for us were ones that gave the team member back hours of time each week. That slack was then used to increase the pace of work even more. If you want to try this out for free then ask your team member to list out their most annoying weekly task. Then time them to see how long it takes. Then see if you can't automate it using a simple script or even a template.

[← Economist Zone](https://economistzone.com/) [Every back issue](https://economistzone.com/page/2/)

## Also in this issue

1

### [Team Management for Hybrid Work](https://economistzone.com/qa/team-management-for-hybrid-work/)

Economist Zone · Mar 30

2

### [Staffing Decisions That Protect Quality When Work Outruns Capacity](https://economistzone.com/qa/staffing-decisions-that-protect-quality-when-work-outruns-capacity/)

Economist Zone · Jul 1

3

### [Hybrid Work Norms That Cut Meetings and Boost Focus](https://economistzone.com/qa/hybrid-work-norms-that-cut-meetings-and-boost-focus/)

Economist Zone · Aug 17

4

### [How Teams Prioritize Customer Feedback That Matters](https://economistzone.com/qa/how-teams-prioritize-customer-feedback-that-matters/)

Economist Zone · Nov 23

## About the paper

Economist Zone is the premier destination for those eager to delve deeper into the world of economics.

[About Economist Zone](https://economistzone.com/about/) [Back issues](https://economistzone.com/page/2/)

Write for us

Have something to say about this beat?

Submit an article or do an interview for Economist Zone.

[Write for us →](https://economistzone.com/write-for-us/?entryPoint=article-end)

---

- Source: https://economistzone.com/qa/how-workplace-leaders-protect-teams-from-burnout/
- Published: 2026-11-25
- Publisher: Connectively
